IIT BOMBAY · CLIMATE-RISK RESEARCH PORTFOLIO

Physical climate risk × infrastructure investment

8 METROS · 8 FINANCIAL YEARS · INDIA

Where climate hazard, policy architecture and capital deployment meet.

InfraClimate turns an original project-year research panel into an interactive decision-support dashboard. It keeps physical hazard (PHCRI), formal policy stringency (PSI) and realised annual CAPEX analytically distinct.

STUDY FOOTPRINT

Eight metro systems

Click a city marker to inspect the metro profile.Markers use latitude/longitude city references; map geometry is not used in the statistical analysis.
TIME SERIES

Annual system-level movement

PROJECT COMPARISON

Mean physical-hazard pressure

✓
Interpretation boundary

PHCRI is a relative physical-hazard index, not a complete climate-risk score. The econometric result is an association, not a causal estimate. Robustness specifications are displayed alongside the preferred model.

PHYSICAL HAZARD CLIMATE RISK INDEX

Inspect the six underlying hazard indicators.

Every value below comes from the 64-observation PHCRI appendix. Percentile bars are derived across the same fixed study panel.

PHCRI—
HAZARD FINGERPRINT

Selected city-year

PCA ARCHITECTURE

How PHCRI is constructed

COMPARATIVE VIEW

PHCRI through time

REALISED CAPITAL DEPLOYMENT

Follow ₹94,235.43 crore of observed project-year CAPEX.

Investment Behaviour is realised annual CAPEX, not sanctioned cost, loan inflow or project efficiency.

Mean annual CAPEX—
Peak observed year—
CAPEX PATH

Annual realised investment

PROJECT SCALE

Mean annual CAPEX by metro

CLIMATE–INVESTMENT SPACE

Hazard pressure vs annual CAPEX

Descriptive scatter only. PHCRI was not the explanatory variable in the final investment regression.
POLICY STRINGENCY & PANEL ECONOMETRICS

Inspect the preferred result — and the uncertainty around it.

The final model relates previous-year PSI to current-year log CAPEX. The dashboard deliberately keeps robustness results visible.

MODEL COMPARISON

Lagged PSI coefficient

MODEL-IMPLIED ASSOCIATION

Customize a PSI change

Model-implied change in current-year CAPEX——
Not a forecast or causal effect. This calculator applies the selected semi-log coefficient mechanically: 100 × [exp(β·ΔPSI) − 1].
Hausman testp = 0.2844RE not rejected
Breusch–Pagan LMp < 0.001Panel effects matter
INDEX SENSITIVITY

Change the national–state policy weighting

METRO PROJECT EXPLORER

One project, eight years, one traceable record at a time.

POLICY-TO-IMPLEMENTATION BRIDGE

Climate-resilient metro investment action matrix.

These recommendations are reproduced from the thesis implementation matrix; no new numerical benefit estimates are invented.

REPRODUCIBILITY & DATA GOVERNANCE

Every headline metric has a visible lineage.

The dashboard contains no simulated weather observations, synthetic CAPEX values or fabricated policy scores.

01

Investment Behaviour

Realised annual CAPEX, prioritising additions to CWIP/PPE and excluding financing inflows and double-counted capitalisation transfers.

02

PHCRI

Six heat/rainfall indicators, z-standardised; PCA on the 64-observation frame; PC1 + PC2 retained and variance-weighted; final 0–100 relative rescaling.

03

PSI

Policy-stock approach. Final index = 70% national component + 30% state component; alternative 50:50 and 30:70 versions preserved.

04

Panel model

ln(CAPEX)it = α + β·PSIi,t−1 + ui + εit. FE and RE compared using Hausman; thesis interpretation remains associative.

DATA LINEAGE

Source hierarchy

  1. Metro annual reports / audited statementsCWIP, PPE additions, CAPEX notes and project disclosures
  2. India Meteorological Department station dataDaily maximum temperature, rainfall and long-period normals
  3. Official national & state policy instrumentsRules, notifications, action plans, missions and institutions
  4. Stata 17 model outputFE, RE, Hausman, clustered and year-effect specifications
QUALITY CONTROL

Automated reconstruction checks

LIMITATIONS

What this dashboard does not claim

Small panel: eight projects; 54 regression observations after lagging.

PHCRI ≠ full climate risk: it captures physical hazard, not asset exposure, vulnerability or adaptation capacity.

PSI ≠ enforcement: it represents formal policy architecture and implementation mechanisms.

CAPEX ≠ efficiency: high or low annual expenditure is not a project-performance ranking.

No causal claim: unobserved time-varying factors can influence capital execution.

Robustness uncertainty: significance does not survive project-clustered and year-effect specifications.

Research ownership

Underlying thesis methodology and thesis-derived datasets are © 2026 Parimal Bhakare. This portfolio package does not include the thesis PDF or restricted stakeholder records. See docs/DATA_RIGHTS.md.

External methodological references

Official IMD thresholds and IPCC climate-risk context are listed in docs/SOURCES.md. External references support definitions only; they do not replace the author's empirical dataset.